12.04.2021

Projet WIBEBA / Wieselburg

Trust in Mühlböck drying technology for over 30 years! The first two dry kilns were installed at Wibeba Holz in Wieselburg as early as 1988. More dry kilns, a steaming kiln and a vacuum dryer followe...

Lire la suite
30.03.2021

Projet Moulin / France

Séchage du bois de conifères avec système d'air fourni unique au monde Grâce aux références positives et à l’intérêt à nos nouvelles technologies nous avons pu gagner la scierie Moulin en France en t...

Lire la suite
02.02.2021

Projet Schroth, Neustädtlein / Allemagne

New dry kilns 1306 PRO and modernization Drying of pallets In the course of a larger overall investment (wood-fired boiler, expansion of the heating network, construction of two new halls including ...

Lire la suite
18.12.2020

Project Binderholz Baruth - dry kilns 1306 PRO

Further extension of drying capacity At the beginning of 2019 the first dry kilns 1306 PRO for Binderholz Oberrot | Baruth GmbH (formerly Klenk Holz) were put into operation in Baruth (Germany). Sinc...

Lire la suite
07.12.2020

Project MLTC Bioenergy Centre, Saskatchewan / Canada

Séchoir haute performance à économie d'énergie Meadow Lake Tribal Council (MLTC) est une scierie appartenant à des autochtones canadiens. Pour ce projet ambitieux - la production et l'utilisation d'un...

Lire la suite