Project Gebrüder Steininger, Rastenfeld (AUT)

The 1306 PRO Drying System impresses once again

The first 1306 PRO Drying Kilns were put into operation at Gebrüder Steininger in Rastenfeld, Lower Austria, at the beginning of the year.

That is why 1306 PRO Drying Kilns are uniquely designed from first principles to reduce the thermal energy requirement and power consumption by up to 25%, without any restrictions on the drying process. This is made possible by the kiln design with its unique air supply and exhaust system and vertical heating coil.

The 1306 PRO Drying System impresses across the board at Gebrüder Steininger. Two further systems have been ordered and will be installed this year.