The six drying kilns Type 606 have been installed at the end of 2016 in Bad Wörishofen and taken into operation at the beginning of this year. These are equiped with the new drying kilns control system K5.
To reduce the sound power level, the kilns including heat recovery have been claded with PU-elements, in line with the company building.